Wind Power Construction Will Drive The New Development Of Hoisting Belt Industry

Wind Power Construction Will Drive The New Development Of Hoisting Belt Industry

Date:Dec 03, 2018

The country's new energy strategy for the relatively depressed electric construction enterprises are a shot in the arm, with the shift of the focus of the national energy policy, wind power construction will become a long time in the future of electric construction enterprises deer, and this trend will also lead to Dongfang as the representative of the hoisting Belt enterprises a new round of development. 

Fan hoisting as the main crane operation, with hoisting belt, sling and other construction, strong professionalism, greater risk. In place the height is often above 70~80m, with the increase of the fan single capacity, there are more than 100m in place height of the fan appears. Hoisting operations must be safe in safety, there is no small matter in the accident.

Wind power hoisting construction enterprises must pay more attention to the selection and use of hoisting operation machinery. The selection of hoisting equipment is mainly considered from the fan model, including the maximum load of the fan, the need for maximum operating radius, the height of the position, the topography of the site and other factors, and then according to the surrounding situation of comprehensive consideration, and finally determine a safe and efficient hoisting scheme.


Previous: No Information

Next: Soft Ring Form Of Synthetic Fiber Hoisting Belt