Offshore Gas Round Sling

Offshore Gas Round Sling

1. The correct method coefficient shall be used, and the overload is prohibited; 2. Use the protective material to separate the edges of the round slings and the load; 3. Do not drag the round sling and the load during the lifting; 4. Do not impact or vibrate the load;

image001

1. The correct method coefficient shall be used, and the overload is prohibited;

2. Use the protective material to separate the edges of the round slings and the load;

3. Do not drag the round sling and the load during the lifting;

4. Do not impact or vibrate the load;

image003

Hot Tags: offshore gas round sling, China, manufacturers, suppliers, factory, wholesale, customized, buy, price, for sale, made in China

Previous: Offshore Oil Round Sling

Next: Transportation Round Sling